Consulting services PMO

Contract year

2014

Explorative planning study

  • Illustration of the core and support processes
  • Adaption room program desired state
  • Development of test planning with cost estimation
  • Operating costs calculation
  • Preparation of the final reports together with the architect / room planner

Contract year

2012 – 2013

Feasibility study – Concentration acute care offering in one location

  • Analysis offer mix current state
  • Success factors and operating costs of all three locations
  • Development of operating concepts and desired state income be based on the supply mix
  • Room program development
  • Process-optimized room arrangements development
  • Investment and operating costs per variant calculations
  • Comparison of variants and decision-making basis for the Board of Directors
  • Elaboration of the feasibility study together with the architect

Pictures

Beratungsleistungen PMO

Auftragsjahr

2014

Testplanung

  • Abbildung der Kern- und Supportprozesse
  • Adaption Raumprogramm SOLL
  • Erarbeitung Testplanung mit Kostenschätzung
  • Kalkulation der Betriebskosten
  • Ausarbeitung der Abschlussberichte zusammen mit dem Architekten / Raumplaner

Auftragsjahr

2012 – 2013

Machbarkeitsstudie – Konzentration Akutleistungen auf einen Standort

  • Analyse Angebotsmix IST
  • Erfolgsfaktoren und Betriebskosten aller drei Standorte
  • Erarbeitung der Betriebskonzepte und Erträge SOLL basierend auf dem Angebotsmix SOLL
  • Erarbeitung der Raumprogramme
  • Entwicklung der prozessoptimierten Raumanordnungen
  • Berechnung der Investition und der Betriebskosten je Variante
  • Variantenvergleich und Entscheidungsgrundlage zuhanden des Verwaltungsrates
  • Ausarbeitung der Machbarkeitsstudie zusammen mit dem Architekten